2014-12-31
Source: Channel NewsAsia 31 Dec 2014 New season parking scheme for motorcyclists introduced The
2014-11-03
Source: Channel NewsAsia 3 Nov 2014 How a satellite-based ERP system will benefit motorists: Transport
2014-10-18
Source: Today Online 18 October 2014 LTA calls tender for next generation ERP system Challenges facing
2014-10-06
Source: Channel NewsAsia 6 Oct 2013 New ERP system using GNSS technology may boost demand for off-peak
2014-10-01
Source: Straits Times 1 Oct 2014 LTA calls tender for next generation ERP system The Land Transport
2013-10-07
Source: Straits Times 6 Oct 2013 Three pilot sites to be implemented with mechanised parking systems by
2013-10-02
Source: Straits Times 13 March 2013   Industrial carparks being used as offices But URA says such
2013-09-16
Source: Straits Times 04 Sept 2013   Rather than cruising the streets of Singapore, Mr William
2013-08-23
Source: The Straits Times 15/08/13 SOME unhappy owners at Parc Oasis want the Strata Titles Board
2013-08-22
Source: Straits Times   First it was the Land Transport Authority. Now the Housing Board is installing
3 Pilot Test sites with mechanised parking systems

Source: Straits Times

6 Oct 2013

Three pilot sites to be implemented with mechanised parking systems by 2015

HDB will implement mechanised parking systems at three pilot sites in Bukit Panjang, Yishun and Changi Village, announced Government Parliamentary Committee for National Development and Environment chairman Lee Bee Wah on Sunday.

The implementation follows a joint study by the parliamentary committee and HDB started last year on the viability of mechanised parking systems (MPS) in Singapore to address car park shortages in older HDB estates, where space for new lots to be built are limited.

The three sites are the carpark beside Block 259A Bangkit Road, the carpark next to Block 666A Yishun Avenue 4 and behind Block 1 Changi Village Road. The pilot implementation is set to be completed by 2015.

“We have assessed that mechanised car parks have good potential as they can provide additional parking lots in estates with site constraints. However, not every HDB estate is suitable for MPS implementation," said Ms Lee, who toured the Bukit Panjang pilot site on Sunday with fellow GPC member and Bukit Panjang MP Teo Ho Pin.

The Bukit Panjang pilot site is situated next to a multi-storey carpark and occupies an area the size of a basketball court. It will likely have a two-tower mechanised parking system at least 10 storeys high each that will provide an estimated 60 car park slots in total.

On his blog on Sunday, Minister for National Development Khaw Boon Wan said car park shortages become a problem for HDB estates as car ownership increases and adding new car park lots might "not always be possible" with land constraints.

"The pilot would allow HDB to gauge public acceptance of the system," he wrote.

To park a car using the mechanised system, a driver drives his vehicle into a car-lift, parks it in the correct position and pulls the handbrake. The system will automatically park the car after the driver keys in a pin number.